Page 5 - FQ10493.Morgan-KirkmanInc.Greensboro.NC.DC15000G (Gravity Drain)
P. 5

Page No. 4
                                                                                Proposal No. Q10493
                                                                                Date:  May 3, 2017
               Two (2)      Water Make-Up Valves Including:

                            1.      Average rate solenoid operated valve.
                                    1.1  Anti-hammer diaphragm seat.

               One (1)      Outer Wall Temperature Sensor.

               One (1)      Water Recirculation Assembly Including:

                            1.      Temperature actuated switch - electronic signaling type.
                            2.      Recirculation water valve - solenoid operated.
                                    2.1  Anti-hammer diaphragm seat.

               One (1)      Safety Monitor Including:

                            1.      Temperature actuated switch - electrical signaling.
                            2.      Safety shut-down features are included on the Ludell water heaters that
                                    shut the heater down, if the stack temperature, water wall level, or wall
                                    temperature exceed normal operating levels.
                            3.      Automatic refire is a feature of the heater that is operational when all
                                    heater safety requirements are satisfied.  A safety shut-down will require
                                    the heater to be restarted manually in accordance with the requirements of
                                    U.L.

               One (1)      Set of Drawings Including:

                            1.      Piping schematic.
                            2.      Wiring schematic.

               One (1)      Operating and Maintenance Manual

               Note I - Ludell Field Service

                       Ludell has included in its proposal the services of our field engineer for start-up.  The
                       engineer will:  inspect the equipment for proper installation, adjust controls to factory
                       standards, verify performance guarantees, and instruct your personnel on the
                       equipment features, maintenance and operational use.  It is necessary to contact the
                       Ludell Service Department two (2) weeks prior to your planned equipment start-up.
                       Service is scheduled to begin and end during the normal work week (Monday – Friday).
                       Normal workday is 8 hours; any overtime will be billed separately.  Weekend travel
                       and/or short term notice start-up service will be charged at additional cost.  Additional
                       trips and service will be billed on a per diem basis, plus travel and living expenses at
                       cost.

               Note II - Certified Inspection

                            All Ludell Direct Contact Water Heaters are factory inspected.