Page 6 - FQ10470.KonwinskiConstructionInc.MI.DC10000 w3000GalTank
P. 6

Page No. 5
                                                                                Proposal No. Q10470
                                                                                Date:  March 29, 2017

               One (1)      Safety Monitor System Including:

                            1.      Temperature actuated switches - electrical signaling.

                            2.      Level switches (water wall).
                                    Pressure switches (verifies water flow).

                            3.      Safety shut-down features are included on the Ludell water heaters that shut
                                    the heater down, if the stack temperature water wall level, or wall temperature
                                    exceed normal operating levels.

                            4.      Automatic refire is a feature of the heater that is operational when all heater
                                    safety requirements are satisfied.  A safety shut-down will require the heater to
                                    be restarted manually in accordance with the requirements of U.L.

               One (1)      Set of Drawings Including:

                            1.      Piping schematic.
                            2.      Wiring schematic.

               One (1)      Operating and Maintenance Manual


               Note 1 – Ludell Field Service

                       Ludell has included in its proposal the services of our field engineer for one visit, for two (2)
                       consecutive days at no added cost.  The engineer will:  inspect the equipment for proper
                       installation, adjust controls to factory standards, verify performance guarantees, and
                       instruct your personnel on the equipment features, maintenance and operational use.  It is
                       necessary to contact the Ludell Service Department two (2) weeks prior to your planned
                       equipment start-up.  Service is scheduled to begin and end during the normal work week
                       (Monday – Friday).  Normal workday is 8 hours; any overtime will be billed separately.
                       Weekend travel and/or short term notice start-up service will be charged at additional
                       cost.  Additional trips and service will be billed on a per diem basis, plus travel and living
                       expenses at cost.


               Note II - Certified Inspection

                            All Ludell Direct Contact Water Heaters are factory inspected.
   1   2   3   4   5   6   7   8   9   10   11