Page 4 - Wanandege Sacco Office Face-Lift Proposal
P. 4

(c) Finance O ce                                                              (h) The Stairway leading to the main entrance on the 1st  oor need

                To replace:   • Visitors’ chair in  nance o ce                               to be redesigned as they are now worn out
                             • Seats (3 seater and 2 seater) in waiting area/ outside the  (i) Ground Floor Reception/Security Desk
                               Finance Manager’s o ce
                                                                                              To install:  • A 3D Wanandege logo wall branding that lights up at night
        (d) Accounts O ce                                                                     Branding:    • A broadbase roll up banner with an appealing design
                To replace:  • The visitors’ seat                                                            listing Wanandege Sacco

                                                                                               To replace:  • Reception desk with a modern one
        (e) Credit Manager’s O ce
                 To replace:  • 2 visitors’ seats
                             • O ce Cabinets                                          (j) Main Entrance to The Building
                * Other items to be replaced or installed in the Credit Manager’s o ce         To replace:  • The old signage needs to be replaced with a new
                also fall under the General Category, which we will outline at the end of                    3D signage
                the proposal.
                                                                                      (k) On the Outer Side of The Walls of The Building
        (f) Banking Hall
                                                                                               To install:  • A large Full Color LED screen, where
                To replace:  • Door number 20                                                                the organization can display videos
                             • Glass panel on the left side of the banking hall’s                            showcasing its services and products
                               entrance                                                                      and also sell advertising space
                             • All door signages
                             • 2 visitors’ seats at the teller section                                     • Lightbox signages (5m x 6m) to be placed on the top  oor walls
                                                                                                             facing the roads in order to display Wanandege products. Total
                Branding:    • A broadbase banner with new appealing design                                  of signs will be 6 (i.e, 3 signages per wall)
                             • Glass panel on the left side of the banking hall’s
                               entrance                                               ** (L) Recommended upgrades to be e ected generally in all
                             • All door signages
                                                                                                  departments/o ces and spaces in the building
                To install:  • A 54 inch LED display screen to display Wanandege
                               Sacco o ers, products and services to waiting cusomers       • Ceiling fans in all o ces
                             • A Notice board for pinning notices                           • Dust bins in all o ces
                             • A new “Bank working hours” sign to be placed on the
                               wall above the glass panel instead of being placed on        • Window blinds in all windows
                               the glass panel itself                                       • Computer cabling in all necessary areas
                             • A two-seater shoulder-to shoulder workstation to replace     • Window graphics in all necessary areas
                               the two desks in the waiting bay
                             • New suggestion box (Made from Perspex)                       • Painting all spaces inside and outside the building
                                                                                            • Acquiring and placing o ce cabinets in all necessary areas
        (g) The metallic main door on the  rst needs to be branded with                     • Installing new  indoor  signage on all doors
               a board as opposed to a white sticker                                        • Polish the Floor of the whole wanandege o ce
   1   2   3   4   5   6