Page 43 - Critical Control flipbook_Neat
P. 43

Contact with Hot Meal











           1    What is the name of the       2    What are its specific objectives related to the Priority Unwanted
                critical control for Contact
                                                   Event (PUE)?
                with Hot Meal?
          Emergency Preparedness             Prepare for potential emergencies involving hot meal contact with personnel


           3    What are the critical         4    What are the activities       5    What can be sampled from
                control performance
                                                   within the management
                                                                                      the set of activities for
                requirements to meet the           systems that support               verification, providing a
                objectives?                        having the critical control        clear image of the critical
                                                   able to do what is required?       control status?
          All jobs involving preheater opening   Potential Hot Meal Flushing routes must   Operator understanding of escape
          have an escape plan detailing escape   be identified and provisions made to   routes
          routes                             allow emergency escape for personnel in
                                             the area

          Operational Emergency Showers,     Inspection and testing on monthly basis  Inspection and testing records or field
          Eyewash Stations and First aid kits                                   tags (i.e. color coded tag by month)
          available in potential areas of spillages
          At minimum: kiln inlet floor and three
          lower stages of the preheater

          Radio Communication (2-way) between   Testing of radio communication with CCR   Spot check of all radios
          CCR and all crews in preheater tower  prior to access controlled areas

           6    What is the target performance for critical     7    What is the critical control performance
                                                                     trigger for shutdown, critical control review or
                control?
                                                                     investigation?

          Mitigate the severity of incidents and injuries related to hot meal  Lack of or not functioning Emergency Shower/Eyewash station
                                                               Lack of escape route from potential Hot Meal Flushes

































          Creation date: 01/2021 • The latest and only controlled version of this document is available on the HSE intranet.
          © 2021 Holcim - For internal use only
   38   39   40   41   42   43   44   45   46   47   48