Page 2176 - National Electrical Price Guide
P. 2176

National Electrical Price Guide

                                                         Assemblies
                          Feeder IMC & Wire    With Unistrut, Rod and Clamps  3" IMC 4#250, 1#2
                             Qty   Description                       Labor        Cost     Retail
                              6   1/2" Threaded Rod                     .06       4.56      31.80
                              1   Galv 12GA 1-5/8" Slotted Channel      .06       2.04      12.75
                              2   1/2" Rod Beam Clamp                   .10       6.50      65.00
                              4   1/2" Flat Washer                      .00        .28       1.96
                              4   1/2" Hex Nut                          .08        .48       3.88
                              10  3" Intermediate Metal Conduit        1.20      115.88    207.05
                              46  #250 THHN Stranded Copper            1.10      138.33    478.69
                              12  #2 THHN Stranded Copper               .12       10.82     35.25
                              1   3" GRC Channel Clamp                  .10       2.08       5.50
                                                                       2.82     $280.96    $841.88
                          Feeder IMC & Wire    With Unistrut, Rod and Clamps  3" IMC 4#300
                             Qty   Description                       Labor        Cost     Retail
                              4   1/2" Flat Washer                      .00        .28       1.96
                              2   1/2" Rod Beam Clamp                   .10       6.50      65.00
                              1   Galv 12GA 1-5/8" Slotted Channel      .06       2.04      12.75
                              4   1/2" Hex Nut                          .08        .48       3.88
                              6   1/2" Threaded Rod                     .06       4.56      31.80
                              10  3" Intermediate Metal Conduit        1.20      115.88    207.05
                              46  #300 THHN Stranded Copper            1.20      165.89    571.21
                              1   3" GRC Channel Clamp                  .10       2.08       5.50
                                                                       2.80     $297.71    $899.15
                          Feeder IMC & Wire    With Unistrut, Rod and Clamps  3" IMC 4#300, 1#2
                             Qty   Description                       Labor        Cost     Retail
                              4   1/2" Hex Nut                          .08        .48       3.88
                              4   1/2" Flat Washer                      .00        .28       1.96
                              2   1/2" Rod Beam Clamp                   .10       6.50      65.00
                              6   1/2" Threaded Rod                     .06       4.56      31.80
                              1   Galv 12GA 1-5/8" Slotted Channel      .06       2.04      12.75
                              10  3" Intermediate Metal Conduit        1.20      115.88    207.05
                              12  #2 THHN Stranded Copper               .12       10.82     35.25
                              46  #300 THHN Stranded Copper            1.20      165.89    571.21
                              1   3" GRC Channel Clamp                  .10       2.08       5.50
                                                                       2.92     $308.52    $934.39
                          Feeder IMC & Wire    With Unistrut, Rod and Clamps  3" IMC 4#350

                             Qty   Description                       Labor        Cost     Retail
                              1   Galv 12GA 1-5/8" Slotted Channel      .06       2.04      12.75
                              4   1/2" Flat Washer                      .00        .28       1.96
                              4   1/2" Hex Nut                          .08        .48       3.88
                              6   1/2" Threaded Rod                     .06       4.56      31.80
                              2   1/2" Rod Beam Clamp                   .10       6.50      65.00
                              10  3" Intermediate Metal Conduit        1.20      115.88    207.05
                              46  #350 THHN Stranded Copper            1.47      194.24    668.73
                              1   3" GRC Channel Clamp                  .10       2.08       5.50
                                                                       3.07     $326.06    $996.67
                          Feeder IMC & Wire    With Unistrut, Rod and Clamps  3" IMC 4#350, 1#1/0

                             Qty   Description                       Labor        Cost     Retail
                              2   1/2" Rod Beam Clamp                   .10       6.50      65.00
                              6   1/2" Threaded Rod                     .06       4.56      31.80
                              4   1/2" Hex Nut                          .08        .48       3.88
                              4   1/2" Flat Washer                      .00        .28       1.96
                              1   Galv 12GA 1-5/8" Slotted Channel      .06       2.04      12.75
                              10  3" Intermediate Metal Conduit        1.20      115.88    207.05
                              46  #350 THHN Stranded Copper            1.47      194.24    668.73
                              12  #1/0 THHN Stranded Copper             .16       16.37     53.24
                              1   3" GRC Channel Clamp                  .10       2.08       5.50
                                                                       3.23     $342.43   $1049.92



                                        ASSEMBLIES CONTAINING CONDUIT ARE BASED ON 10' LENGTHS
                                 COST COLUMN IS A NATIONAL AVERAGE AND SHOULD BE VERIFIED FOR YOUR AREA
                                           COPYRIGHT @ 1996-2019 by ELECTRICAL RESOURCES, INC.
   2171   2172   2173   2174   2175   2176   2177   2178   2179   2180   2181