Page 6 - Re MP MLA
P. 6
The subject location at LC No.9 at Km 15/7-8
Construction of RUB between VKB- SSPD stations. --As existing
at Gatvanampally, bank height is insufficient, RUB/ LHS is not
Mominpet Mandal. feasible.
The subject location at LC No.18 T at Km
Construction of RUB 35/5-6 at Marpalli (MRF) yard. As existing
at Morangapalli at bank height is insufficient, RUB/ LHS is not
Mominpet Mandal. feasible
Strengthening of the The above location is at ROB NO. 119 @ km
existing bridge of 111/16-18 at Vikarbad Yard which is in good
Railway Station, condition. Hence strengthening is not required.
Vikarabad.
Laying of alternate The above location is at Bridge No. 134 at Km
120/22-28 at CTF yard. Joint inspection along
road near Moosi river
crossing (Vikarabad with State Government Officials has been
junction). conducted on 28-04-2021 and found that laying
of alternate road is not feasible as the area will
be inundated during rains/floods.
Construction of
another footpath at Work for Provision of Additional FOB at
Vikarabad Railway Vikarabad proposed in 2018-19 and 2019-20
Station. but not sanctioned.
3 Sri Umesh G. Chittapur 21-09- Foot over Bridge work Foot over Bridge at Chittapur is in progress, 23.09.2021.
Jadhav– Railway 2021 in complete at the status of work is -footings concrete work
Hon’ble station Chittapur Railway completed. Stanchion erected. girders
Member of towards station towards station launching completed. The work will be
Parliament, station Tanda Chittapur: completed by 15 of December 2021.
th
Kalaburagi Tanda
Chittapur
6