testing  was  carried  out  by  DM&HO/WGL  of  Telangana  State
                  government. A total of 774 members are tested for COVID-19 from
                  06.04.2021  to  12.04.2021  (including  family  members  of  positive
                  cases).  The  health  condition  of  COVID  positive  staff  is  regularly
                  monitored by the respective supervisors.



                                     4. SYSTEM IMPROVEMENTS



                               1.     Test Stands for CCB 1.5 and CCB 2.0 system

                  HHP  locos  are  provided  with  CCB  1.5  and  CCB  2.0  air  brake
                  system. Conventionally,  the valves and LRU’s are tested on loco
                  alongwith other testing as no test stands were avaiable. Testing on
                  locomotive  consumes  more  time  and  is  a  laborious  process.
                  Hence,  test  stands  were  fabricated in-house with available  men
                  and material. These test stands reduce man power and precious
                  time for testing the valves/LRUs (Line replaceable Units) separately
                  enabling component level attention .

























                             (CCB 1.5 Test Stand)                     (CCB 2.0 Test Stand)
                         (For Testing of CCB 1.5              (For Testing of CCB 2.0 LRUs)
                                     Valves)




               S.         Item         Broco make             Cost             ART/KZJ              Cost
                No                                                              make

                          High
                        Volume
                 1                                          96612.50                              2200.00
                        Oxygen
                       regulator