7. Electrification of Vasavadatta Cement siding (VCSG)/ Seram:
Electrification works on the lead line and in plant was completed
in 2013. Charging could not be done due to objection from local
public. This causing delay in operations and forced to operate
diesel traction in underwire territory.
Assistance Required COACHING:
Provision of 03(three) Stabling lines at Secunderabad Station
proposed in PWP 22-23 at a cost of 8.49crs.
-----