Page 60 - ENGINEERING
P. 60

15.FLOOD HISTORY,INSTANCE OF HFL ABOVE DL,OR NEGATIVE FREE BOARD
                                                                 Year of
                         SSE/P/Way-  Br.No./            Type of
                    Sl.No.                      Span            occuran        HFL at what level        Remarks
                           Section   Location           structure
                                                                  ce
                   SC-WADI  SECTION
                     1      SNF                                           Nil
                                                                        Drainage water from out side drain
                                   HFZ Yard loop                 Every   enters into yard. Flooding over the
                     2      LPI                 WD                                                         -
                                       line                       year  catch water drain & loop line on SC
                                                                              end gets flooded.
                                                       Manjeera
                                                       water Pipe      Embankment  at km:154/20-22 DN line
                                    Mid Section
                     3      LPI               NPL-TLPR  line of   2020  between NPL-TLPR wahshed out  due   -
                                   KM:154/20-22
                                                        HMWSSB             to bursting of water pipe line.
                                                       (1.20M dia)
                                     Br.No.123
                     4      VKB                 RMY      Pipe     2001    Water touched danger level.      -
                                    KM:123/0-2
                                                                                                      Side slopes of
                                                                                                    embankments are
                                                                        Due to heavy rain fall the bank was   provided with Pitched
                                                                        saturated and a vertical cut at the
                                    Mid Section                                                      stones & cement
                     5      TDU               TDU-RMY River KAGANA  2020  bottom of embankment making
                                   KM: 79/1-79/3                                                    grouting sub bank ,
                                                                        slippage at cess resulting in shrinkage   retaining wall with
                                                                           of embankment and track.
                                                                                                     weep holes are
                                                                                                       provided.
                                                                                                      central drain is
                                    Mid Section                                                     provided between
                     6      SEM               CT-MQR      -       2005  Water over flowed track on 19.07.2005.
                                    KM:19/12-13                                                       two tracks with
                                                                                                     pitched stones ,
                                                                                                   cement grouting and
                                                                  2006                                sub bank and
                                    Mid Section                        Water over flowed track on 20.07.2006   retaining wall with
                     7      SEM               CT-MQR      -        &
                                    KM:20/5-7                                   & 16.07.2020         weep holes are
                                                                   2020
                                                                                                       provided.