Page 55 - ENGINEERING
P. 55
10. SCHEDULE OF GAP SURVEY AND ADJUSTMENT OF GAPS
FOLLOWED OR NOT.
gap
S. Section PWI Sec. Block sec. km Total survey Done Action
No. km taken
from to due on
1 SC-WD Nil
11. LIST OF INFRINGEMENTS
INFRINGEMENT
SL. SIGNAL DISTANCE
NO STATION NO SIGNAL DESCRIPTION Remarks
LH RH
SC-WADI SECTION
1 SC S 17 DN 3RD Line LSS 2.25 2.15
2 SC S 62 UP Rd 8 Starter 2.16 2.6
3 SC S 67 UP Rd 3 Starter 2.25 2.3
4 SC S 77 UP Rou. H/SIG Kzj end 2.33 2.33
5 SC S 82 DN Rd 11 Starter 2.35 2.35
6 HYB S1A Home Signal 2.40 2.48
7 HYB S17 RD-1 Starter (SH-18) 2.38 6.30
8 HYB S15 RD-2 Starter (SH-14) 2.84 3.16
9 HYB S9 RD-5 Starter (SH-8) 2.75 2.43
10 HYB S7 RD-6 Starter (SH-8) 2.27 2.30
11 HYB SH-2 2.45 2.32
12 HYB SH-3 2.40 2.87
13 HYB SH-5 SP-2 2.55 2.40
14 HSJ S8 Starter SC to BMT 2.78 5.29
15 HSJ S6 Starter (HYB side) 2.31 2.20
16 HSJ S5 Common Loop starter SC-HYB 2.40 2.18
17 HSJ S25 Starter BMT - SC 2.65
18 HSJ S24 Advace Starter BMT-SC 3.30
19 HSJ S27 Common Loop starter HYB-SC 2.98
20 HSJ S26 Main line starter HYB-SC 290 3.20
21 HSJ S29 Home signal 4.81
22 HSJ S3 Starter SC to HYB 2.45
23 SNF S6 Goods loop -1 Starter 2.59
24 SNF S7 Goods loop -2 Starter 2.29 2.25
25 SNF S8 Goods loop -3 Starter 2.25 2.25
26 SNF S9 Goods loop -2 Starter 2.92
27 SNF S10 Common loop -1 Starter 2.45 2.4
28 SNF S13 Down Main Line Starter 2.79
29 SNF S12 Down Common Starter 2.42
30 SNF SH 36 SHUNT 2.68 2.47
31 SNF SH 37 SHUNT 2.73
32 SNF SH 20 SHUNT 2.55 2.38
33 SNF SH 35 SHUNT 2.04
34 SNF S38 Goods Loop-4 Starter 2.84 8.54