Page 52 - ENGINEERING
P. 52

8.2 ANALYSIS OF DEFECTS DETECTED DURING USFD TESTING OF RAILS/WELDS
                    BETWEEN  SC-WADI UP AND DN LINES.


                                                                                    f
                                                                                   e
                                                                                      c
                                                                                     e
                                                                           f
                  Testing    Section  UP/  GMT  Frequency   IMR/     OBS                         ctive                                               Remarks
                                                                            e
                                                                                  D
                                                                                       t

                                                                         D
                                                                      S
                                                                    O
                                                                      B
                                                                                        v
                                                                                       i
                                                                                         e
                                                                          e
                                                                                           Action taken
                Description          DN        of testing  IMR(W)  (R)  (W)  (DFWO)  (DFWR)
                                                                                             All are
                                               once in 3
                             SC-VKB  UP  19.89            0     15   29                    Joggled fish   Along with
                                                months
                                                                                             plated   NBC/GFC/NGF
                                                                                                       C Rail testing
                                                                                             All are   the following
                                               once in 3                                                tests such as
                             VKB-WD  UP  19.71            0     7    15                    Joggled fish
                                                months                                       plated       Winter
             NBC/GFC/NGFC                                                                               precaution
             Rail testing                                                                             testing, Test free
                                               once in 3                                     All are       rail
                             SC-VKB  DN 17.01             0     13   12                    Joggled fish
                                                months                                                testing,Switches
                                                                                             plated    and Intensive
                                                                                                      rail testings are
                                                                                             All are   carried in the
                                               once in 4
                             VKB-WD DN 14.03              0     35   61                    Joggled fish   Division.
                                                months
                                                                                             plated
                                                                                             All are
                                               once in 3
             Flaw detected in  SC-VKB  UP  19.89  yrs                       65       0     Joggled fish
             1)  Service  weld                                                               plated
             testing(Including
             welds  on  high                   once in 3                                     All are
                                                                                                       DFWR will be
             banks,cuttings   VKB-WD  UP  19.71   yrs                       28       0     Joggled fish   replaced within
             and      curves)                                                                plated
             2)New      weld                                                                          3 months after it
                                                                                                        is detected.
             testing                                                                         All are     DFWR is
             3) Fracture prone  SC-VKB  DN 17.01  once in 3                 48       0     Joggled fish   replaced.
             locations                                                    yrs                plated
             4)   All  major
             bridges     and                                                                 All are
             approaches.                       once in 4
                             VKB-WD DN 14.03                                114      0     Joggled fish
                                                  yrs
                                                                                             plated
                  Total                                   0     70  117    255       0