Page 49 - ENGINEERING
P. 49
7. LWR REQUIRING DESTRESSING
KM Last
S. PWI UP/ Total LWR Reason for
No. Section Sec. Block sec. DN length distressing destressing
from to done on
1 SNF-WD VKB VKB-CTF UP 111.45 113.15 1.700 10/2011 CTR
2 SNF-WD VKB VKB-CTF UP 113.15 114.48 1.330 08/2015 TRR
3 SNF-WD VKB VKB-CTF UP 115.02 121.00 5.980 08/2015 TRR
4 SNF-WD VKB CTF-GGD UP 121.00 122.27 1.265 05/2016 CTR
5 SNF-WD VKB CTF-GGD UP 122.78 127.82 5.040 05/2016 TRR
6 SNF-SC SNF BMT-HSJ DN 179.99 180.595 0.605 02/2012 CTR
7 SNF-SC SNF HYB-HSJ UP 185.00 185.94 0.937 05/2009 CTR
8 SNF-SC SNF HSJ-HYB DN 185.00 185.95 0.945 02/2004 CTR
9 SNF-SC SC HSJ-SC DN 190.96 194.10 3.140 04/2010 CTR