Page 47 - ENGINEERING
P. 47
5. LONG DURATION SPEED RESTRICTIONS CONTINUING FOR MORE THAN
7 DAYS AS ON 19.11.2021
Kilometre Time Loss (min) Nature of work
S. Sr.DEN/ OL Block UP/ From To (Total/Cumulativ Classifi
N or DN SR Date Plan Un- Cons
o DEN CN Section /SL ned planned tn e/Weekly cation
Km TP Km TP Progress)
WD -SC (DN)
Gate road work
1 WD-SC OL TDU-Yard DN 70 8 70 10 50 11-Nov-21 1.00 P
on progress
2 WD-SC OL TDU-Yard DN 71 16 71 18 75 1-Nov-21 0.33 COT P
3 WD-SC OL TDU-RMY DN 74 4 74 6 60 26-Sep-21 0.33 COT P
4 WD-SC OL SNF-Yard DN 175 36 176 6 50 9-Nov-21 1.00 Rough running O
Painting work at
5 WD-SC OL HSJ-SC DN 192 32 193 6 30 2-Nov-21 2.13 O
Br.no: 244, 245
Total 1.67 3.13 0.00
TOTAL TIME LOSS 4.80
ENGG.TIME ALLOWANCE 21.00
SC-WD (UP)
CMS-X-Ing
1 SC-WD OL SNF-Yard UP 174 27 174 25 30 4-Nov-21 2 B
renewal Pt No:11A
Total 0.00 2.00 0.00
TOTAL TIME LOSS 2.00
ENGG.TIME ALLOWANCE 21.00
A) Due to Condition of T/out Sleepers F) Due to Corroded /Wornout Rails/Bent rails
B) Due to Condition of Switches/Xings G) Due to Rail/Weld Failure
C) Dute to condition of Br Timbers H) Due to Formation Problem
D) Due to Ballast Defficiency P) Sanctioned Works like CTR/DS/TWR/Br
E) Due to scabbed Rails O) Others