Page 12 - Electrical TRSO
P. 12
3.4 RELIABILITY / SAFETY:
Random checking of Loco Pilot’s Closed User Group (CUG) /
Personal mobile phone status while on duty and Surprise mobile
check at en-route stations at an average of 1204 per month has
reduced the menace of keeping the mobile on.
Ambush checks with speed guns done at an average of 186 per
month by TRSO officers and supervisors. This has alerted crew to
maintain speed at CD spots/Loop lines.
Speedometer monitoring data downloading and analysis at an
average of 84 per month at all lobbies is being done.
SPM analysis and VCD data analysis vis-à-vis CTR timings and
counselling the Running staff to run at maximum permissible speed
and also cross checking the safety parameters.
To monitor the situations and activities over Crew Booking Lobbies,
Crew Running Rooms, Trip Sheds and Railway Consumer Depots,
Surveillance CCTVs with visual record facility are installed and
maintained.
Crew video and voice recording system data is being downloaded
from the locomotives and analysis is being done. Till now 102 no of
CVVRS data downloaded.
3.5 WORKS UNDER TRSO:
LIST OF SANCTIONED WORKS
Allocation
S Plan Proposed
N Head Description of work Cost Status
o
(Rs.000’s)
Replacement of over aged
DRF
1 6400 / dilapidated Running room 27960 Work under
OSW
progress
at MUGR.
Augmentation/
6400 improvement of Running RRSK Work In
2 OSW room capacity at Chittapur. 20000 Progress.
6400 Augmentation/ CAP Tender
3 improvement of Running under
OSW 4822
Room at Bidar. Finalisation