Page 9 - Electrical TRSO
P. 9

Safety Meetings

                 Interaction  with  running  staff  through
                  safety meetings (5 nos Avg. per Month)
                  have been conducted to counsel the
                  running  staff  about  recent  unusual
                  incidents  and  steps  to  be  taken  to
                  avoid such incidents.



            2.  ACHIEVEMENTS (HIGHLIGHTS) OF TRSO

             2.1 REDUCTION OF REVENUE EXPENDITURE:
               31.46  million units of electrical energy was saved by  shutting down
                  locos, switching off blowers, coasting & Regeneration and 938 KL of
                  HSD Oil was saved by shutting down of Diesel locos resulting in to a
                  saving of Rs. 8.59 Cr. (2020-21 (Apr-Mar) – 34.43 Cr saved).
               Outsourcing  activities  like  CTR  feeding,  booking  etc  of  all  crew
                  lobbies are managed departmentally resulting in to a saving of 98.32
                  Lakhs.
               Reducing  the  man  power  at  BIDR  and  PRLI  Running  rooms,  Sand

                  Contracts has saved an amount of  67.80 lakhs.



            2.2  IMPROVEMENTS IN RUNNING ROOM/CREW LOBBIES :

               Bellampalli  (BPA)  running room is  renovated  by
                  Providing  Partition  between  beds,  which  helps

                  in  maintaining social distance and also to avoid
                  disturbance to crew.



               Relays  /  Contactors  panel  of  conventional  &  3
                  phase  locomotives  has  been  provided  at  KZJ
                  lobby  for  practical  demonstration  and  to
                  improve  the  technical  knowledge  of  Running
                  staff.
   4   5   6   7   8   9   10   11   12   13   14