Page 12 - SAFETY
P. 12
Removal of main door of a coach was
Satellite link was established by NDRF. less time consuming and removed in 13
minutes.
Media coverage at mock drill site on 08.04.2021
c. Bi Monthly safety audit conducted by PCSO/SC and other HODs at RDM &
BPA stations on 02/03.07.2021. DRM/SC conducted inspections at PRLI
station, yard, lobby & Running room on 16.07.21
PCSO inspection at Lobby/RDM on 02.07.21 At A cabin/RDM on 02.7.21