Page 12 - SAFETY
P. 12

Removal of main door of a coach was
                Satellite link was established by NDRF.        less time consuming and removed in 13
                                                                                minutes.






















                                      Media coverage at mock drill site on 08.04.2021

               c.  Bi Monthly safety audit conducted by PCSO/SC and other HODs at RDM &
                   BPA  stations  on  02/03.07.2021.  DRM/SC  conducted  inspections  at  PRLI
                   station, yard, lobby & Running room on 16.07.21

























                    PCSO inspection at Lobby/RDM on 02.07.21                 At A cabin/RDM on 02.7.21
   7   8   9   10   11   12   13   14   15   16   17