Page 14 - S & T
P. 14
Last Annual
Sl. Station Officer Inspection SSE Last Quarterly
No. Inspection Date
Date
17 RMY ADSTE/VKB 12.01.2021 SSE/S/TDU 08.08.2021
18 TDU ADSTE/VKB 23.09.2021 SSE/S/TDU 16.10.2021
19 MVH ADSTE/VKB 09.01.2021 SSE/S/TDU 29.10.2021
20 NAW ADSTE/VKB 13.08.2021 SSE/S/TDU 21.08.2021
21 KQT ADSTE/VKB 10.02.2021 SSE/S/TDU 19.08.2021
22 SEM ADSTE/VKB 16.06.2021 SSE/S/TDU 25.10.2021
23 MQR ADSTE/VKB 16.02.2021 SSE/S/TDU 22.10.2021
24 CT ADSTE/VKB 04.04.2021 SSE/S/TDU 28.08.2021
25 SUH ADSTE/VKB 29.06.2021 SSE/S/TDU 27.10.2021
26 WD (Block) ADSTE/VKB 29.06.2021 SSE/S/TDU 30.10.2021
11. Problems In Overhead Alignment Program Of Cable: Not Applicable
12. Track circuiting works –Status, Sanction, Program, Progress: Nil
13. LC gates interlocking - Status:
13.1 LC GATES INTERLOCKED IN 2012-2020 IN OVERALL DIVISION:40 LCGATES
Date of
Sl.No. LC No. Class Station/ Section
Commissioning
1 LC-20 SPL OPL – JMKT 31.08.12
2 LC-11 A HSP – OPL 29.06.12
3 LC-17 A OPL – JMKT 07.02.12
4 LC-76 A RLT – SKZR 11.09.12
5 LC-34 A WP – ALER 19.10.12
6 LC-20A B1 SKP – NPL 21.07.12
7 LC-69 A YGL-NKD 28.11.12
8 LC-118 B1 BKL – MTMI 29.06.13
9 LC-113 B1 CKN-BKL 19.06.13
10 LC- 23 SPL NPL-LPI 17.09.13
11 LC-108 A PNDP – CKN 21.03.2014
12 LC-119 A BKL – MTMI 07.04.2014
13 LC - 60A C KZJ YARD 24.03.2015
14 LC-138 A CVV YARD 08.04.2015
15 LC- 46 B1 RGP-IPG 09.09.2015
16 LC -134 B2 YP-GNN 24.02.2016
17 LC -57 B2 PQL-KZJ 12.07.2016