15.2  DEFECTIVE CURRENT REGULATOR / ECR RELAY:

                      I
                     n order to arrest failures of current regulators; tight sealing of signal units and
                      provision of greased glazed graphite rope to prevent entry  of water/rodents
                      and replacement of modified current regulators has been provided.
                    AC LED’s are provided in place of DC LED to improve reliability.
                    LED ECRs for all LED signals is provided.
                    1414 nos. of Integrated LEDs are provided so far in 2021-22 (through AAC and
                      works), cumulative progress is 5213 integrated LEDs.

               15.3 CABLE DEFECTS / CUTS / THEFTS BY MISCREANTS:

                       Use of cable route locators for survey is made compulsory. Integrated cable
                      path diagram was made. Criminal cases are registered against the agencies
                      that are cutting cables in addition to imposing penalties.
                      Defective  cables  identified  by  carrying  out  Cable  meggering  at  regular
                      intervals  (152 locations  done  in  2021-22  till date)  and  replaced  about  54.774
                      Km of defective cable in 2021-22.
                      ELD’s are provided at all stations and monitored through Data logger.

               16. POWER SUPPLY ARRANGEMENTS:

                      At  141  stations  integrated  power  supply  system  out  of  143  stations  and  two
                      stations not required, since temporarily closed and at IB /LC/stations 122 no. of
                      Mini  Integrate  Power  supply  system  is  provided.  The  other  stations  have
                      discrete systems consisting  of battery chargers and secondary cells for each
                      application. The following works are planned for improvement in power supply
                      scenario.

                          Non Blanking of Stations/LC gates/Auto sections:
                        ●  The work of strengthening of power supply arrangement in Auto signaling
                           section between SNF-LPI sanctioned in LSWP 2017-18. Cable lying in Auto
                           section completed. LPI – HFZ Auto section Mini IPS provided and achieved
                           Non-  blanking  signals.  Other  Auto  section  Goomties  provision  under
                           progress by Engineering department.