Page 3 - Mech (C&W) info
P. 3
2. Maintenance Of Coaching Rakes:
Primary Secondary OEM
Depot Daily Non-daily No. of Daily Non-daily Daily Non-daily
trains trains Rakes trains trains trains trains
SC 9 14 38 - 3 9 7
HYB 4 9 25 - - 5 2
KHNP - - - - - - -
KZJ - - - - - 3 1
BDCR - - - - - 1 -
MUGR - - - - - 1 -
LPI - - - - - 5 2
KRMR - - - - - - 1
PRLI - - - - - 1 -
BIDR - - - - - 3 2
TDU - - - - - 1 -
Total 13 21 63 - 3 29 15
3. Rolling-in Examination and Watering points:
R/I Examination*
Station Daily Non-daily Watering facilities at station
trains trains
Available for all 10 PFs
SC 52 58 (Quick watering system with SCADA)
HYB 10 11 Available for all 6 PFs
Available for all 3 PFs
KZJ 52 66
(Booster Pumps are available)
WL 56 96 Not available
BDCR 2 - Available for 2 PFs (PF nos.1 & 2)
MUGR 1 - Available (Only one PF is available)
Not available (Water hydrants are
LPI 5 2
available on OEM lines.
PRLI 10 8 Available for 2 PFs (PF nos.1 & 3)
BIDR 10 18 Available for 1 PF (PF no.3)
KRMR - - Available (Only one PF is available)
Total 179 263 -