Page 7 - Mech (C&W) info
P. 7
3. Examination of Freight Trains:
Average examination of rakes per month
Depot
2019-20 2020-21 2021-22 (Apr-Oct)
RDM 100 123 127
BPA 107 119 134
SNF 67 78 82
DKJ 21 30 52
SEM 20 24 41
MQR 18 1 3
KZJ 15 22 25
Total 348 397 464
% improvement over
previous year - 14 % 17 %
2. System improvements:
i. Introduction of on-train attention of embedded empty wagons at
BTPD siding: To reduce wagon rejections at Sidings, on train
attention of embedded wagons at BTPD siding has been
introduced from 9 th Jul, 2021. Till now, 678 wagons have been
attended in 72 rakes. This improved loading and contribute to
increased earnings.
ii. Reduction in embedded wagons in BOXN rakes and additional
earnings: After introduction of on train repair facilities at 13 major
loading sidings, the extent of rejections of wagons has been
drastically reduced to bare minimum. The details of the repaired
wagons are as under:
7