Page 10 - Mech (C&W) info
P. 10
defects on Rolling stock during run, thereby enhancing safety of
trains.
Bearing defects through Rail Bearing Acoustic Monitor (Rail BAM) by
comparing the preloaded sounds of defective bearings.
Wheel defects through Wheel Condition Monitor (WCM) by
measuring wheel impact load on Rail.
LC Rail BAM
Gate
Junction
KZJ Box
End
BPQ
End
WCM Sensors
on either
Optical
Sensors side
Camera with night Control
vision arrangements on room
one side
x. Loading of Granite stones in BRN rakes: Generally transportation of
Granite stones will be on BOXN wagons. There is a demand for
loading granite stones on BRN wagons as freight rebate scheme is
given to BRN wagons. Mechanical department of SC division has
prepared loading pattern of Granite stone on BRN wagons duly
following the safety norms and trials were conducted successfully.
Based on that, RDSO issued guidelines for transportation of Granite
stones loaded in BRN wagons. 189 BRN rakes were loaded with
Granite stones at KRMR/GDRA during 2021-2022(April-Oct).
xi. Examination of Container rakes at TMX siding in Hyderabad
division: C&W Staff from Sanath nagar depot are being deputed
to TMX siding(Timmapur) of Hyderabad division for examination of
Container rakes and total 18 rakes have been examined during
the 2021-22(Apr-Oct).
10