Page 16 - Operating
P. 16

7.  Electrification of Vasavadatta Cement siding (VCSG)/ Seram:
                Electrification works on the lead line and in plant was completed
                in 2013. Charging could not be done due to objection from local
                public.  This  causing  delay  in  operations  and  forced  to  operate
                diesel traction in underwire territory.


               Assistance Required COACHING:
                   Provision of 03(three) Stabling lines at Secunderabad Station

                      proposed in PWP 22-23 at a cost of 8.49crs.



                                                              -----
   11   12   13   14   15   16