Page 15 - ELS KZJ
P. 15
S
. Date of month
N Equipment issue Holding (Locos) Locos/ Qty to be provided Provided up to last year Provided during the Cumu. during current year Balance Action plan
o
fitment (SMI/0301) Rev’0’
Procedure of pneumatic tube connection As per ELS/LGD practice, providing
to electro-pneumatic contactor of 30.08.1
14. 97 97 75 -- 20 02 6mm Teflon pipes and 6mm push fitting
harmonic filter/ hotel load converter in three 7 for SR1&2 and Harmonic filter
phase locomotives. (SMI/313)
Procedure for testing and setting of Pressure
15. Switches in E70 & CCB Brake Systems 11.02.1 97 97 -- -- -- -- Being followed.
9
(SMI/327(Rev.0))
Modification to support the DE & NDE side
over hangs of stators of the 3 phase TM type 18.03.0
16. 97 97 85 -- -- 12 Pertains to TMW/NKRD,CNB
6FRA 6068 during rewinding (MS/0355 Rev 8
'2')
Modification of mounting arrangement of
17. MCB-100 fitted in Aux. converter 29.08.0 97 97 -- -- -- NIL In IGBT BURs MCB 100 is located on BUR2
8
which is accessible to crew.
(MS/0367Rev'0')
Provision of grease outlet channel at NDE 07.07.1 Modification is being done during
18. 97 97 84 -- 13 NIL
side of 3PhTM (MS/0387 ) 0 replacement of end shields with SGCI
Modified interferences between TM
assembly components in order to ensure 03.10.1 The limits given MS/415 are being
19. 97 97 -- -- -- --
adequate interference between assembly 2 adopted while providing new bearings.
components of TM Type 6FRA606 (MS/0415 )
Modification for avoiding necessity of cab 1. Partial cab redundancy as CLW Lr.
20. changing in case of failure of processor 26.02.1 97 13 13 -- -- NIL No. C-D&D/T/42, Dt13.03.18.
4
cards of VCU of WAG9/WAG9H (MS/0429 ) 2. In TCN VCU redundancy is available.
Modification to avoid failure of temperature
sensors due to increase in resistance value 06.01.1
21. 97 97 90 -- 07 NIL Being followed.
of temperature sensor cable shielding. 5
(EL/MS/0437)
Modification of outer bearing cap (DE) to
22. drain out in greased gear case oil from 28.11.1 97 97 -- -- -- -- Being followed.
6
6FRA6068 type TM [MS/439
Modification improving the reliability of the Pivot 09
23. motor supports in bogies of WAP7/WAG9 17.09.1 97 26 09 -- 08 Bogi Under Progress through ELS/LGD work order;
During Major schedule.
5
locos (EL/MS/0443) Bogie e
Provision of Top operated handle for CBC in 23.04.1
24. 97 97 27 -- -- 70 Under Progress
place of bottom operated handle.MS/454 6