                       .                                              Date of                            month
                      N                  Equipment                     issue    Holding   (Locos)   Locos/ Qty   to be   provided   Provided   up to last   year   Provided   during the   Cumu.   during   current   year   Balance   Action plan
                      o
                          fitment (SMI/0301) Rev’0’
                          Procedure  of  pneumatic  tube  connection                                                     As  per  ELS/LGD  practice,  providing
                          to   electro-pneumatic    contactor     of   30.08.1
                      14.                                                      97     97     75      --     20      02   6mm Teflon pipes and 6mm push fitting
                          harmonic filter/ hotel load converter in three   7                                             for SR1&2  and Harmonic filter
                          phase locomotives. (SMI/313)
                          Procedure for testing and setting of Pressure
                      15. Switches  in  E70  &  CCB  Brake  Systems   11.02.1  97     97      --     --      --     --   Being followed.
                                                                         9
                          (SMI/327(Rev.0))
                          Modification  to  support  the  DE  &  NDE  side
                          over hangs of stators of the 3 phase TM type   18.03.0
                      16.                                                      97     97     85      --      --     12   Pertains to TMW/NKRD,CNB
                          6FRA  6068  during  rewinding  (MS/0355  Rev   8
                          '2')
                          Modification  of  mounting  arrangement  of
                      17. MCB-100    fitted   in   Aux.   converter   29.08.0  97     97      --     --      --    NIL   In  IGBT  BURs  MCB  100  is  located  on  BUR2
                                                                         8
                                                                                                                         which is accessible to crew.
                          (MS/0367Rev'0')
                          Provision  of  grease  outlet  channel  at  NDE   07.07.1                                      Modification  is  being  done  during
                      18.                                                      97     97     84      --     13     NIL
                          side of 3PhTM     (MS/0387 )                   0                                               replacement of end shields with SGCI
                          Modified   interferences   between     TM
                          assembly  components  in  order  to  ensure   03.10.1                                          The  limits  given  MS/415  are  being
                     19.                                                       97     97      --     --      --     --
                          adequate  interference  between  assembly      2                                               adopted while providing new bearings.
                          components of TM Type 6FRA606 (MS/0415 )
                          Modification  for  avoiding  necessity  of  cab                                                1. Partial cab redundancy as CLW Lr.
                     20.  changing  in  case  of  failure  of  processor   26.02.1  97   13   13     --      --    NIL   No. C-D&D/T/42, Dt13.03.18.
                                                                         4
                          cards of VCU of WAG9/WAG9H (MS/0429 )                                                         2. In TCN VCU redundancy is available.
                          Modification to avoid failure of temperature
                          sensors  due  to  increase  in  resistance  value   06.01.1
                     21.                                                       97     97     90      --     07     NIL   Being followed.
                          of  temperature  sensor  cable  shielding.     5
                          (EL/MS/0437)
                          Modification  of  outer  bearing  cap  (DE)  to
                     22.  drain  out  in  greased  gear  case  oil  from   28.11.1  97   97   --     --      --     --   Being followed.
                                                                         6
                          6FRA6068 type TM [MS/439
                          Modification  improving  the  reliability  of  the         Pivot                          09
                     23.  motor  supports  in  bogies  of  WAP7/WAG9   17.09.1  97    26     09      --     08     Bogi  Under Progress through ELS/LGD work order;
                                                                                                                         During Major schedule.
                                                                         5
                          locos (EL/MS/0443)                                        Bogie                           e
                          Provision of Top operated handle for CBC in  23.04.1
                      24.                                                      97     97     27      --      --     70   Under Progress
                          place  of  bottom  operated  handle.MS/454     6