Page 14 - ELS KZJ
P. 14

S
                       .                                              Date of                            month
                      N                  Equipment                     issue    Holding   (Locos)   Locos/ Qty   to be   provided   Provided   up to last   year   Provided   during the   Cumu.   during   current   year   Balance   Action plan
                      o
                          (g)  Parallelism  and  perpendicularity  of
                          brake hangers should ensured at the time of  31.05.1  97    37     37      --      --     --   Being done during IOH
                          IOH/POH  or  replacement  of  brake  hangers   8
                          on test jig SMI/0251 (Rev'2')
                          (h)  Clearance  of  13mm  between  bogie    31.05.1
                          frame and brake hanger should be ensured       8     97     37     37      --      --     --   Being followed
                          SMI/0251 (Rev'2')
                          (i)  Brake  hangers  of  different  makes  and   31.05.1                                       Ensuring that different make/ design
                          designs should not be provided in the same     8     97     37     37      --      --     --   hangers not available in one assembly
                          assembly SMI/0251 (Rev'2')
                          Air  delivery  measurement  in  three  phase
                          loco  to  ascertain  proper  cooling  and   08.05.0                                            Continuous activity. Being carried out
                      6.                                                       97     97      --     --      --     --
                          pressurization of machine room   (SMI/0255     9                                               by PPO in every schedule.
                          Rev'0')
                          Modified   instructions   on   maintenance
                          practices  and use/ replacement of spares/   09.12.0                                           Continuous activity. Being carried out in
                      7.                                                       97     97      --     --      --     --
                          material for traction link and housing for 3Ph   9                                             every schedule.
                          locos (SMI/0259 )
                          Maintenance  of  Traction  motor  support
                          plate  and  bogie  nose  to  prevent  crack/  16.03.1
                      8.  breakage  of  traction  motor  support  plate.    6   97    97      --     --      --    NIL   All  TM  back  plates  are  8mm  and
                          (Holder  for    Traction  motor  -suspension)  (Rev-1)                                         above.
                          (SMI/0269 )
                                                                      16.03.1
                          DPT should be conducted on motor support
                      9.                                                 6     97     97      --     --      --     --   Being followed as regular activity.
                          during TOH/IOH/POH
                                                                      (Rev-1)
                                                                      16.03.1
                          Checking of the condition of Spheribloc’s of
                      10.                                                6     97     97      --     --      --     --   Being followed as regular activity.
                          TM support torque arms during all schedules
                                                                      (Rev-1)
                          Creating  facility/  Measurement  of  axial
                      11. wear   of   Spheribloc   before   re-using    17.11.1  97   97      --     --      --     --   Being replaced as must change item in
                                                                                                                         IOH. Every 4 years.
                                                                         1
                          (SMI/0270 )
                          Special maintenance instruction to prevent
                      12. falling  of  Brake  Hanger  in  middle  axles  of   16.09.1  97   60   51   --    09     NIL   Completed.
                                                                         4
                          WAP-7 locomotives (SMI/282)
                          Use  of  induction  heater  for  heating  of  end   08.11.1
                      13.                                                      97     97      --     --      --     --   Being followed.
                          shields/  end  frames  of  TMs  for  bearing   6
   9   10   11   12   13   14   15   16   17   18