Reliability measures incorporated in Locos( including innovations)
S
. Date of
N Equipment issue Holding (Locos) Locos/ Qty to be provided Provided up to last year Provided during the month Cumu. during current year Balance Action plan
o
Modification of Traction link flange & 24.10.0 Superseded by SMI/259;
1. 97 97 -- -- -- NIL
mounting bolts.(SMI/0241 Rev'0') 6 completed
Provision of safety slings to avoid falling 08.11.0
2. down of compressor unit on line 6 97 97 -- -- -- NIL Completed
(SMI/0242Rev'0')
Maintenance of axle box bearings for WAP7 Being followed. Sealed bearings will be
3. & WAG9/ WAG9H locos. [SMI/0246 (Rev'1) 26.11.1 97 97 -- -- -- -- replaced with unsealed bearings during
5
Dt. 26.11.15 bearing replacement
Being followed. (Intactness and
Maintenance of earthing system 22.11.0
4. 97 97 -- -- -- -- tightness of all earth shunts being
(SMI/0248Rev'0') 7
ensured)
SMI/0251 (Rev'2') on Maintenance instruction for brake hangers for
WAG9/WAG9H locos DT.31.05.18
(a)Provision of double safety slings in 31.05.1 97 37 37 -- -- Nil Completed
crosswise arrangement 8
(b) DPT should be conducted at the
welding portion of brake hangers during 31.05.1 97 37 37 -- -- -- Being followed
MOH/lifting of loco to detect crack 8
SMI/0251 (Rev'2')
(c) Ensure provision of FS lock nuts & sealing
compound for brake hanger top suspension 31.05.1
5. 97 37 37 -- -- -- Being followed
threaded bolt and brake rod connecting 8
pin SMI/0251 (Rev'2')
(d) Ensure the slit in the brake equipment 31.05.1
should be in arc of 717 mm radius. SMI/0251 8 97 37 37 -- -- -- Being followed
(Rev'2')
(e) Ensure availability of slack adjuster on all 31.05.1 97 37 37 -- -- -- Being ensured
units SMI/0251 (Rev'2') 8
(f) Parallelism of brake hangers should be 31.05.1
checked using GO-No-Go gauge SMI/0251 8 97 37 37 -- -- -- Being ensured
(Rev'2')