Action Plan Targets.
Sl. Progress Cum
No Description Target during the Progress Remarks
2021-22
month 2021-22
1 No. of accidents on loco Nil Nil Nil
account
Nil
No. of locos overdue for major
2 (TOH-52, IOH- Nil Nil
schedule
29 & POH-2)
Outage in freight locos (above
3 8% 9.81% 9.27%
R.B.’s Target)
Statistical Ineffective
4 3.0% 1.84% 2.77%
Percentage
5 Hourly Ineffective percentage 7.0% 5.48% 6.17%
UORs per 100 locos (on Loco Total-149 (WAG-
6a 120 12.9 88.39
account) 7=51, WAG-9=98 )
6b Defects Detected at Shed (DD 10% Imp last 17 183 Total- 183 (WAG-
cases) year (337.5) 7=72, WAG-9=111)
Locos causing punctuality loss Total-05 ( WAG-
7 incidences 12 0.56 2..97 7=02, WAG-9= 3)
(Loco account)./100 Locos
Asset failures on ownership basis 8% Imp last Total- 43 (WAG-
8 1.69 25.5
(on Loco account)/ 100 locos. year (32.75) 7=18, WAG-9=25 )
9 Un Schedule visits/100 Locos 50 1.69 20.76 Total-32
10 Un Schedule lifting’s/ 100 Locos ( 20 1.13 14.8 Total-23
including minor schedule lifting)
01 Loco Set- 01 Loco
2 loco sets of
11 Availability of motorized bogies each loco WAG-7 Set-WAG-7
with brake rigging 01 Loco Set- 01 Loco
type
WAG-9 Set-WAG-9
Fe = 159 MT 19.181 MT 76.721 MT 1. Lead Acid
Batteries 10V,
12 Scrap disposal
Non-Fe =9 MT 0.561 MT 5.023 MT 75AH capacity-
128Nos
5% Reduction PU-27-55582
last year + cost PU-28-22037
cutting PU-32-23957
measures in PU-33-28072
Maintenance cost/loco towards PU-27 on (up to Sep-
13 PU-27, PU-28,PU-32, PU-33 (other account of 21)
than POH) covid-19
PU-27-106933
PU-28-47281
PU-32-60714
PU-33-110822