Page 2 - SIM Guide to annual assessment_v2.0_Dec 2021
P. 2

Structural Integrity Management (SIM)

                                                  Field Guide

                                      to Annual Assessments





















































                  Some photographs used in this document  are representative of
             different status of deterioration of concrete and steel structures, but they
                          have not necessarily been taken at a Holcim facility.

              The remarks and good practices compiled in the document have been

               proposed and validated by different structural integrity inspectors and
                                            experts of Holcim Group.















             Creation date : Sep  2021
             Last Revision date : Dec  2021 - Version number:  2.0
             The latest and only controlled version of this document
             is available on the HSE intranet.
             © 2021 Holcim
   1   2   3   4   5   6   7