Page 2 - SIM Guide to annual assessment_v2.0_Dec 2021
P. 2
Structural Integrity Management (SIM)
Field Guide
to Annual Assessments
Some photographs used in this document are representative of
different status of deterioration of concrete and steel structures, but they
have not necessarily been taken at a Holcim facility.
The remarks and good practices compiled in the document have been
proposed and validated by different structural integrity inspectors and
experts of Holcim Group.
Creation date : Sep 2021
Last Revision date : Dec 2021 - Version number: 2.0
The latest and only controlled version of this document
is available on the HSE intranet.
© 2021 Holcim