Bonaberi and Figuil
World Class EI
Faster lockout, safer work CAMEROON
Opportunity Results Cement
To reinforce Energy • 22 VCS installed across
Isolation safety, a solution 7 bucket elevators and
was needed to cut errors 1 belt conveyor
and shortcuts while • Zero EI-related incidents
making isolation quicker on affected equipment
and easier. The aim: safer • 25% faster inspection
practices with higher and maintenance
efficiency in inspections
and maintenance.
Solution
22 Visual Cut-Off
Switches (VCS) were Xavier Legrand
installed at inspection CEO
and work points,
enabling direct isolation
of conveyors and
bucket elevators. This
simplified execution and
accelerated the process
while ensuring safety.
Cost: 19 kCHF (22 VCS) Amine Derridj
Timeline: 10 months Industrial Director