Page 114 - Zero is Possible - Volume 3
P. 114

Abidjan
        World Class EI

        Procedures that protect,

        skills that last                                                                                   IVORY    COAST  Cement

        Opportunity              •  Established a steering
        The goal was to develop   team and weekly follow-
        high-standard Energy      ups to ensure quality and
        Isolation procedures      alignment
        aligned with World Class
        EI expectations, while   Cost: 20 kCHF
        strengthening local team   Timeline: 1 year
        expertise in safe and
        consistent EI practices.  Results
                                 •  High-quality, standardized
        Solution                  EI procedures meeting
        To ensure a solid         global best practices                                                 Rachid Yousry
        foundation, the team     •  Team efficiency: 350+                                                  CEO
        partnered with an         World Class EI procedures
        expert energy isolation   created (45% of total)
        consultancy to guide the   •  Improved operational
        process from assessment to   discipline and reduced
        implementation:           human error
        •  Conducted a detailed   •  Stronger employee
         site assessment with     engagement and
         mechanical and electrical   technical competence
         teams                                                                                          Kenza Laaouina
        •  Trained a core local team                                                                     Head of HSE
         to develop technically
         sound procedures





                                                                                                                    105
   109   110   111   112   113   114   115   116   117   118   119