Page 114 - Zero is Possible - Volume 3
P. 114
Abidjan
World Class EI
Procedures that protect,
skills that last IVORY COAST Cement
Opportunity • Established a steering
The goal was to develop team and weekly follow-
high-standard Energy ups to ensure quality and
Isolation procedures alignment
aligned with World Class
EI expectations, while Cost: 20 kCHF
strengthening local team Timeline: 1 year
expertise in safe and
consistent EI practices. Results
• High-quality, standardized
Solution EI procedures meeting
To ensure a solid global best practices Rachid Yousry
foundation, the team • Team efficiency: 350+ CEO
partnered with an World Class EI procedures
expert energy isolation created (45% of total)
consultancy to guide the • Improved operational
process from assessment to discipline and reduced
implementation: human error
• Conducted a detailed • Stronger employee
site assessment with engagement and
mechanical and electrical technical competence
teams Kenza Laaouina
• Trained a core local team Head of HSE
to develop technically
sound procedures
105

