Page 116 - Zero is Possible - Volume 3
P. 116
Bouskoura
World Class EI
One click to safer operations MOROCCO
Opportunity completed on-site and
Equipment start-ups carry the digital permit is fully Cement
high risks due to potential closed and validated
human errors. A reliable • Sequential equipment
system was needed to fully integration: The system
control Energy Isolation coordinates complex
(EI), eliminate hazards, and sequences across
prevent serious accidents. multiple machines,
ensuring safe execution at
Solution every step
A fully digital Energy
Isolation system was Cost: 0 CHF (in-house
piloted at Bouskoura, development)
combining digital Timeline: 2 years (including Khalid Samaka
authorization with physical rollout to all country units) CEO
control:
• Digital permit Results
management: All EI • Zero accidents and full
permits and associated compliance with Energy
documentation, including Isolation protocols
World-Class EI procedures, • 100% verification before
are issued, authorized, and any equipment restart
tracked digitally • Complete operator
• Dual physical-digital confidence and trust in Mohammed Al Fakihi
control: Equipment the system Head of HSE
cannot restart remotely
until work is physically
107

