Page 122 - Zero is Possible - Volume 3
P. 122

Campulung
        World Class EI

        Reliable isolation,

        visible safety                                                                                       ROMANIA  Cement


        Opportunity                Results
        Local Isolation Switches (LIS)   •  Safer isolation: The new 397
        lacked reliability and visual   switches (33% installed in
        confirmation of isolation,   2025) replaced the faulty
        leading to failed try-outs.  local isolation switches and
                                    provide visual confirmation
        Solution                    of the energy cut-off
        Three year upgrade plan to   •  Compliance: Full compliance
        install reliable Visible Cut-Off   with Holcim’s Energy
        Switches (VCS) for efficient   Isolation and Standard
        isolation.                  Design Criteria Standards                                           Bogdan Dobre
        VCS were retrofitted keeping   and local safety regulations                                         CEO
        LIS for local testing.     •  Operational efficiency:
        Installation, testing and   reduced downtime
        updated procedures.         for maintenance and
                                    troubleshooting
        Cost: 812 kCHF             •  No incidents of accidental
        (~600 CHF per unit installed)  contact or entrapment with
        Timeline: 4 years           energized equipment

                                                                                                         Radu Oprea
                                                                                                         Head of H&S








                                                                                                                    113
   117   118   119   120   121   122   123   124   125   126   127