Page 122 - Zero is Possible - Volume 3
P. 122
Campulung
World Class EI
Reliable isolation,
visible safety ROMANIA Cement
Opportunity Results
Local Isolation Switches (LIS) • Safer isolation: The new 397
lacked reliability and visual switches (33% installed in
confirmation of isolation, 2025) replaced the faulty
leading to failed try-outs. local isolation switches and
provide visual confirmation
Solution of the energy cut-off
Three year upgrade plan to • Compliance: Full compliance
install reliable Visible Cut-Off with Holcim’s Energy
Switches (VCS) for efficient Isolation and Standard
isolation. Design Criteria Standards Bogdan Dobre
VCS were retrofitted keeping and local safety regulations CEO
LIS for local testing. • Operational efficiency:
Installation, testing and reduced downtime
updated procedures. for maintenance and
troubleshooting
Cost: 812 kCHF • No incidents of accidental
(~600 CHF per unit installed) contact or entrapment with
Timeline: 4 years energized equipment
Radu Oprea
Head of H&S
113