Chryston CPR Plant
                           Water
        UNITED   KINGDOM  Concrete    Products  Recycle, reuse, sustain!




                           Opportunity
                                                   The project required an
                           Process water was
                                                   with an expected
                           recycled into the concrete
                                                   payback of 6 years.
                           manufacturing process   investment of 70 kCHF
                           in limited quantities.
                           Once it met the required   Results
                           standards, the excess was   Process water is now
                           discharged into surface   100% retained on-site.
                           water. Its usage was    There are no emissions
                           significantly restricted   of treated process water
                           due to the site setup,   to the watercourse and
                           preventing water from   freshwater is only used to
        Lee Sleight        being returned to the   top up water levels when
          CEO              recycling tank.         required.

                           Solution                In the first 6 months of
                           Treated process effluent   2024, this has reduced
                           is pumped to a recycling   freshwater usage by 15%
                           water tank instead of   when compared to the
                           being discharged.       same period in the prior
                           This increased the storage   year.
                           of usable water, rather
        Anna Baker         than losing it to the
       Sustainability      surface water discharge.
         Director