Page 287 - Professional Search Engine Optimization (SEO)
P. 287
Version history 286
IBP 10.1 (7 April 2008)
· New, Keyword Manager: You can now edit the keyword name, the number of
searches and the number of results directly in the keyword list.
· New, Top 10 Optimizer: While the Top 10 Optimization report is being created, you
can now continue working with other parts of IBP.
· New, Top 10 Optimizer: There is now a menu that lets you jump directly to a
chapter.
· New, Top 10 Optimizer: You can now pause creating the Top 10 Optimization
report.
· New, Scheduler: You can now specify if all ranking results should be exported or
only the ranking results since the last scheduling.
· New, Scheduler: If you create a ranking comparison report, the scheduler will
automatically set the comparison date to the date of the last scheduling.
· New, Scheduler: When adding a new scheduled task, you can now quickly use the
file name of another scheduled task.
· New, Scheduler: When sending PDF reports to your clients, you can now get a copy
of the email messages (optional).
· New, Scheduler: You can now open the General Settings window from the
Scheduler window.
· New, Submission Manager: There is now an "Add" button in the toolbar of the
semi-automatic submission tool so that you can quickly add your own directories.
The own directories are now listed first.
· New: IBP now warns you if the memory of your computer becomes too fragmented
to avoid crashes.
· Improved: Loading and saving keyword lists is now much faster. In addition,
keywords now use less memory than before, and the keyword files now use 10% less
space on your hard disk.
· Improved, Keyword Manager: IBP now recognizes 4,730 new stop words which
greatly improves the "Get keywords from competitors" feature.
· In addition to English, German, Spanish and French stop words, IBP now
Copyright © 2012 Axandra GmbH - All rights reserved. This work is copyright protected. Visit www.Axandra.com for more website promotion solutions.