Page 102 - CRS E-booklet 2022
P. 102

100


                                                         As per Schedule of
                                                        Standard Dimensions   Existing   Amount
                                                                                         of
                                                                              Actual
             S.No. Description of Infringements      Chap                    Dimensio Infringem  Remarks
                                                       ter   Item   Prescribed   ns     ents
                                                      No.    No.   Dimensions
                 Gradient in Station yard for existing UP
                 main line proposed as UP&DN main line at
              17  BPQ end.(CH:269542.0 to 269662.0)    II    2(a)   1 in 400  1 in 260
                                                                                                Condoned by CRS
                 Gradient in Station yard for existing UP                                       vide sanction No.
              18  loop line proposed as UP main line at BPQ   II  2(a)  1 in 400  1 in 260     6/SC/7/CRS/6/13-14
                 end.(CH:269542.0 to 269662.0)                                                  dated. 10.07.2013
                 Gradient in Station yard for proposed
              19  common loop line at BPQ              II    2(a)   1 in 400  1 in 260
                 end.(CH:269542.0 to 269662.0)
                 Gradient in Station yard for 3rd  main line
              20  at BPQ end.(CH:268601.082 to 269077.84)  II  2(a)  1 in 400  1 in 150

                 Gradient in Station yard for existing UP
              21  main line at BPQ end.(CH:268601.082 to   II  2(a)  1 in 400  1 in 150        Railway Board letter
                 269077.84)                                                                           No.
                 Gradient in Station yard for existing DN                                       2015/CEDO/SD/07
              22  main line at BPQ end.(CH:268601.082 to   II  2(a)  1 in 400  1 in 150         dated. 02.09.2015.
                 269243.25 )
                 Gradient in Station yard for existing DN
              23  main line at BPQ end.(CH:269449.074 to   II  2(a)  1 in 400  1 in 200
                 270674.92 )
                 Gradient in Station yard for existing DN
              24  loop line at BPQ end.(CH:269449.074 to   II  2(a)  1 in 400  1 in 200
                 270247.0 )
                 Gradient in Station yard for 3rd  main line
              25  at KZJ end.(CH:269662.0 to 270674.92)  II  2(a)   1 in 400  1 in 200         Railway Board letter
                                                                                                      No.
                 Gradient in Station yard for existing UP                                       2015/CEDO/SD/07
              26  main line at KZJ end.(CH:269662.0 to   II  2(a)   1 in 400  1 in 200          dated. 02.09.2015.
                 270674.92)
                 Gradient in Station yard for proposed
              27  common loop line at KZJ end.         II    2(a)   1 in 400  1 in 200
                 (CH:269662.0 to 270216.84 )
                 RAMAGUNDAM
                 Gradient in station yard fall for loop and                                    Condoned in ACRS's
              28                                       II     2     1 in 400  1 in 260  0.135
                 rise for down main line.                                                      No. 528 of 6-3-66.
                 Horizantal distance from centre line of
              29  track to water column for down loop at   II  11(iv)  2135 mm  2120 mm  15 mm  …
                 Km. 274/7-8.
                 Horizantal distance from centre line of
              30  track to water column for Road 1 at Km.   II  11(iv)  2135 mm  2120 mm  15 mm  …
                 274/7-8.
              31  Gradient with in the station yard limits for                                 Condoned by CRS
                 Collieries line((CH:973.40M to 2181.90M)  II  2(a)  1 in 400  1 in 352        vide sanction No.
                                                                                               6/SC/7/CRS/02
              32  Gradient with in the station yard limits for                                 dated. 09.12.2011
                 New Bye pass line at KZJ end(CH:1230.0M                                       Condoned by CRS
                 to 1369.0M)(Prop. Take off at CH:1586.64m                                     vide sanction No.
                 on main line is taken as 0.0M for bye pass   II  2(a)  1 in 400  1 in 352     6/SC/7/CRS/02
                 line towards KZJ end)                                                         dated. 09.12.2011

              33  Gradient with in the station yard limits for
                 existing UP&DN main
                 line((CH:1167.0M(KM.275/417) to       II    2(a)   1 in 400  1 in 150
                 CH:1940.88m (KM.276/190.88))
              34  Gradient with in the station yard limits for
                 IOCL siding line((CH:953.0M(KM.275/203) to
                 CH:1478.417m (KM.275/728.417))        II    2(a)   1 in 400  1 in 129          Condoned by Rly.