Page 98 - CRS E-booklet 2022
P. 98
96
27.2. LCs requiring manning action plan : NIL
Creteri Visibility
S. LC Section Location a for TVUs RVUs UP DN Action Remarks
No. No. manni plan
ng LH side RH side
---No unmanned LCs ------
27.3. LCs requiring upgradation action plan :
Creteria for Visibility
S. LC Adjacent Location upgradation TVUs RVUs Right Left Action plan Rema
No. No. Stations rks
Old New UP DN UP DN
class class
Due to
1 8 352/8-10 HSP-OPL C C 2040 73 700 500 1000 450 increasing of
speed , NI
gates to be
eliminated by
DN 340/22-24, RUB/Interlocki
2 15 UD 340/C11- OPL-JMKT C C 5733 49 800 800 800 800 ng . Hence
C12,UP 340/25-27
interlocking
sanctioned
Since RUBs not
3 79 195/23-25 VEM-SKZR C B2 20119 197 300 300 300 300 feasible at
these 3 LCs,
NOTE:- Above 3 gates are sanctioned in LSWP 2022-23 vide Sr,DSTE/SC's letter No. C/SG/242/3300/LSWP/2022-23
dated. 13.10.2022