Page 99 - CRS E-booklet 2022
P. 99
97
27.4. List of Non-Interlocked gates proposed for interlocking
Between Class of Month of
S. No. LC No. Location Section TVUs Remarks
Stations gate Census
Proposed for
1 3 12/9-11 SUH-CT SC-WADI B2 09/2021 21628
Interlocking
2 12 67/24-26 MVH -TDU SC-WADI B2 07/2021 24381 Proposed for
Interlocking
3 19 36/10-11 KRMR-KPHI PDPL-NZB B1 05/2021 29402 Proposed for
Interlocking
4 39 79/6-7 NPML-LPJL PDPL-NZB B2 05/2021 22840 Proposed for
Interlocking
5 40 80/15-16 NPML-LPJL PDPL-NZB B2 05/2021 20875 Proposed for
Interlocking
DKJ-BDCR- Proposed for
6 4MB 10/9-10 DKJ-KRA B2 10/2020 22552
MUGR Interlocking
27.5. a) List of Non-Interlocked gates sanctioned for interlocking
Month
Between Class of
Sl. No. LC No. Location Section of TVUs Position of work
Stations gate
Census
Estimate under
1 8 352/8-10 HSP-OPL BPQ-KZJ C 07/2021 2040
vetting
DN 340/22-24,
2 15 UD 340/C11-C12, OPL-JMKT KZJ-BPQ C 10/2021 5733 Estimate under
UP 340/25-27 vetting
Estimate under
3 79 195/23-25 VEM-SKZR KZJ-BPQ B2 06/2021 20119
vetting
4 26 48/5-6 KPHI-GDRA PDPL-NZB B1 05/2021 26837 Estimate vetted.
b) List of Non-Interlocked gates sanctioned for RUBs
Between Class of Month of
Sl. No. LC No. Location Section TVUs Position of work
Stations gate Census
RUB work nearing
1 73 213/0-2 ASAF-RLT KZJ-BPQ A 05/2021 38822
completion
Tener calling is under
2 115A 509/12-14 CKN-BKL KZJ-KI C 09/2020 7616
process for RUB work
3 72 408/6-8 NKD-INK KZJ-KI C 08/2021 18404 RUB Sanctioned
4 89 459/9-11 GLA-DKJ KZJ-KI C 03/2022 13557 RUB Sanctioned
5 97 476/0-2 MLMG-KMT KZJ-KI A 03/2022 44963 RUB proposed
6 114 506/25-27 CKN-BKL KZJ-KI SPL 12/2019 94304 RUB Sanctioned
7 124 533/4-6 MDR-TNGM KZJ-KI C 12/2021 714 RUB Sanctioned
27.6. Any Level crossings with chains only and with swing gates: Nil
27.7 Unmanned LCs with inadequate visibility : NIL