c) Safety Meetings

                    Interaction  with  running  staff  through
                     safety  meetings  (6  nos  Avg.  per

                     Month)  have  been  conducted  to
                     counsel the running staff about recent
                     unusual  incidents  and  steps  to  be
                     taken to avoid such incidents.




             3.  ACHIEVEMENTS (HIGHLIGHTS) OF TRSO


                 3.1 REDUCTION OF REVENUE EXPENDITURE:

                   42.5   million units of electrical energy was saved by shutting down
                     locos, switching off blowers, coasting & Regeneration and 1341.4

                     KL of HSD Oil was saved by shutting down of Diesel locos resulting
                     in to a saving of Rs. 45.78 Cr.
                   Crew lobby outsourcing activities is carried out departmentally at
                     RDM,  BPA,  BDCR,  DKJ,  PRPI,  MUGR  and  MTMI  which  results  in  a
                     savings of 0.38 Cr.







                 3.2 IMPROVEMENTS IN RUNNING ROOM/CREW LOBBIES :



                   Bavanapalem Rest Room for Crew:
                   Rest  room  with  six  beds  opened  at
                   bavanapalem station to meet loading

                   requirement           at     newly        opened
                   sattupali               station              (JVRB)
                   Jalagam Vengala  Rao  Open  Cast
                   Mines of Singareni Collieries Co Ltd