Page 245 - GM E-BOOKLET 2022
P. 245

Ambush Checks:-


                   Ambush checks with speed guns done at an average of 520 per
                     month  by  TRSO  officers  and  supervisors.  This  has  alerted  crew  to
                     maintain speed at CD spots/Loop lines.

                 Speedo meter and VCD analysis:-


                   Speedometer  monitoring  data  downloading  and  analysis  at  an
                     average of 183 per month at all lobbies is being done.

                   SPM  analysis  and  VCD  data  analysis  vis-à-vis  CTR  timings  and

                     counselling the Running staff to run at maximum permissible speed
                     and also cross checking the safety parameters.

                 CCTV Monitoring at various locations:-

                   To monitor the situations and activities over Crew Booking Lobbies,
                     Crew  Running  Rooms,  Trip  Sheds  and  Railway  Consumer  Depots,
                     Surveillance  CCTVs  with  visual  record  facility  are  installed  and

                     maintained.

                 CVVRS Analysis:-

                   Crew  video  and  voice  recording  system  footage  data  is  being
                     downloaded from the locomotives and analysis is being done.At an

                     average 85 no of CVVRS videos per month data downloaded.


                 4.4 WORKS UNDER TRSO:


                 LIST OF SANCTIONED WORKS
                                                                            Allocation
                  S      Plan                                                Proposed
                 No  Head                Description of work                    Cost                  Status
                                                                             (Rs.000’s)

                                   Replacement of over aged
                 1      Const  / dilapidated Running room                   27960                 90% of work
                        Funds  at MUGR.                                                           completed.


                         6400      Augmentation/                                RRSK         In  ground  floor  2




                                                             243
   240   241   242   243   244   245   246   247   248   249   250