Page 244 - GM E-BOOKLET 2022
P. 244

4.  SYSTEM IMPROVEMENTS


                    12  Trains  were  converted  from  Diesel  to  Traction  for  which  crew

                      was arranged without any detention to the Train


                      Review of Crew links:-


                    KZJ  and  GALA  based  crew  links  are  reviewed  duly  considering

                      through  run  between  BZA-BPQ-BZA.  As  a  result  of  this,  Crew
                      changing at WL station is avoided.



                 4.1 PROMOTIONS:

                        LP(Passenger to LP(Mail /Express):-

                      107  no’s  Loco  Pilot  passengers  were  promoted  as  Loco  Pilot
                        Mail/Express and posted at various depots of SC Division.


                        LP(Goods) to LP(Passenger):-

                      60 no’s Loco Pilot Goods were promoted as Loco Pilot Passenger
                        and posted at various depots of SC Division.

                 Sr.ALP to LP(Goods):-


                      174    nos  Sr.ALP’s were promoted as Adhoc  Loco Pilot (Goods)
                        and posted at Various depots of SC Division.

                 4.2 TRAININGS (UNDERGOING PRESENT):

                   137 No’s of Sr.ALP’s are undergoing Loco Pilot (Goods) training at
                     ETTC /BZA,DTTC/GTL &ZRTI.


                 4.3 RELIABILITY / SAFETY:

                 CUG Switch ON/OFF Status:-

                   Random  checking  of  Loco  Pilot’s  Closed  User  Group  (CUG)  /
                     Personal  mobile  phone  status  while  on  duty  and  Surprise  mobile
                     check  at  en-route  stations  at  an  average  of  2350per  month  has
                     reduced the menace of keeping the mobile ON.




                                                             242
   239   240   241   242   243   244   245   246   247   248   249