The private siding M/s SSCI/JVR-OC at Sattupalli has been energized

                and trail run conducted on 25.08.2022 after duly obtaining the EIG

                sanction vide sanction no. 2208027, dated: 22.08.2022.











               Fig: Charging of JVR-OC PVT Sdg.                         Fig: Electric  Loco Trail Run


               Energisation of 4&5 of RKP-II siding at MCI station (TKM: 4.72, RKM: 2.555 KM):
               Energisation of newly lied OHE on Road 4&5 of RKP-II siding at MCI
               station  from  OHE  mast  Loc.  No.  RKP II/4/1001A  (Km.Ch.04/29.70)  to
               Loc. No.RKP II/6/18 (Km.Ch.06/585.0) done on 27.08.2022  after duly

               obtaining the EIG vide sanction no.  2208025, dated: 22.08.22 and trail

               run conducted.











                                Fig: Charging of 4 & 5 Lines of RKP-II Sdg At MCI.

          Energisation of newly electrified BG line between KHNAPUR(Excl.)-LATUR (Incl.)
           ROAD in VKB-PRLI section (RKM: 98.57, TKM: 112.60 KM):
                             As part of electrification works of single Broad Gauge(BG) line
           between Vikarabad (VKB) – Parli Vaijnath(PRLI) of TKM: 313.86 (269

           RKM), the section between Khanapur(KHNP), Latur Road(LTRR) of TKM
           113 (98.6 RKM) has been commissioned on 29.09.2022 after duly

           obtaining the EIG sanction vide statutory authorisation number 2209035.
           With this 236.25 TKM (RKM: 203.81) of electrification has been completed
           between VKB-PRLI.