Page 265 - GM E-BOOKLET 2022
P. 265

Fig: Rusted cantilever replaced @ loc. 467/6   Fig: Rusted cantilever replaced @ loc. 439/12

                Provision of new earth pits:
           Earthing is used to protect the working men from an electric shock. It
           does this by providing a path through earth electrode for a fault current

           to flow to earth. It also causes the circuit-breaker to switch off the
           electric current to the faulty section. 49 nos (BPA-21 & BPA-21) of new
           earth pits are provided in KZJ-BPQ section for improving the earthing

           network during the month.










                       Fig: new earth pit at BPA station FOB                 Fig: New earth pit in BPA Yard.

             Provision of Thimbles:
               To avert the catenary strands cut inside the
               catenary suspension clamp at the time of
               tripping with high fault currents particularly

                in monkey menace areas, RDSO issued the
                                                                             Fig Thimble in Suspension clamp
               provision thimbles in each location. Total in
                1296 locations thimbles are being provided.

             Provision of Double cleats on platform coping :
                 There are many cases of Structure bonds getting entangled with
           foot board of coach in recent times. To avert such incidents, division

           has come up with the solution by providing the Double cleats for the St.
           bonds on station platforms. Special Drive was launched to ensure the all

           structure bonds at platforms for properly dressing and availability of
           double cleats on coping of platform. Total 272 new Cleats has been
           provided and all other structure bonds were ensured in





                                                           263