Page 268 - GM E-BOOKLET 2022
P. 268
h) Action Plan:
Action plan for block Burst cases:
Use of 100% Walkie talkies (License free) for better
communication among working staff.
Visit of site prior to block planning day.
Ensuring the T&P in Good condition.
Use of LED lights (360°)for the night working in tower car.
Aluminium Catenary wire replacement:
Total TKM Replaced 2017- 2018- 2019- 2020- 2021- 2022-23 Total
before 18 19 20 21 22 ( Till OCT 22)
2016-17
995 TKM 591.13 75 65.124 31.2 49 30.98 10.867 853.37
To be TKM TKM TKM TKM TKM TKM TKM
replaced
NICCO Contact wire replacement:
Total no Replace 2018-19 2019-20 2020-21 2021-22 2022-23 Balan
Tension d ( Till ce
lengths before OCT 22)
2018
Out of 407 2 TL 4 TL 41 TL 80 TL 42 TLs 16 TLs 185
TLs (2.755 (4.049 (53.013 (98.86 ( 53.47 (20.7 TLs
identified, TKMs) TKMs) TKMs) TKM) TKM) TKM)
197(
Identified in
trunk route)
TLs to be
replaced
I) CB trippings Analysis ( Last 6 Months)
st th
Analysis of CB tripping* in the division from 1 April -2022 to 30 September-2022
Bad Trip Foreign
Weather Bird shed/ Tripping Tree
Monkey Short material
Mont (Heavy electrocute ELS with branch
h Electrocut rain and d/ Bird nest shed/ siding es Circuit on
ed Test OHE/
thunderin fallen Panto CBs Fallen Loco
g) defect
Apr 12 8 0 7 19 0 1 0
May 28 17 5 3 17 2 1 0
Jun 39 12 3 7 22 1 0 1
266