h)     Action Plan:

               Action plan for block Burst cases:
                     Use of 100% Walkie talkies (License free) for better
                      communication among working staff.

                     Visit of site prior to block planning day.
                     Ensuring the T&P in Good condition.

                     Use of LED lights (360°)for the night working in tower car.

             Aluminium Catenary wire replacement:
            Total TKM  Replaced  2017-            2018-     2019-     2020-     2021-      2022-23         Total
                            before        18        19        20        21       22      ( Till OCT 22)
                           2016-17
             995 TKM        591.13        75      65.124     31.2       49      30.98       10.867        853.37
              To be          TKM         TKM       TKM       TKM       TKM      TKM          TKM
            replaced

             NICCO Contact wire replacement:

               Total no      Replace      2018-19       2019-20        2020-21     2021-22  2022-23  Balan
               Tension           d                                                                ( Till     ce
               lengths        before                                                           OCT 22)
                               2018
             Out of 407         2 TL        4 TL          41 TL         80 TL        42 TLs      16 TLs      185
                  TLs          (2.755      (4.049       (53.013         (98.86      ( 53.47      (20.7       TLs
             identified,       TKMs)       TKMs)          TKMs)         TKM)         TKM)        TKM)
                 197(
            Identified in
            trunk route)
              TLs  to be
              replaced



           I)  CB trippings Analysis ( Last 6 Months)


                                                                st                  th
             Analysis of CB tripping* in the division from 1  April -2022 to 30  September-2022



                                   Bad                       Trip                                 Foreign
                                 Weather         Bird       shed/  Tripping      Tree
                    Monkey                                                                Short  material
            Mont                 (Heavy  electrocute         ELS       with     branch
              h    Electrocut    rain and  d/ Bird nest  shed/        siding       es    Circuit     on
                       ed                                                                  Test     OHE/
                                thunderin       fallen      Panto      CBs      Fallen              Loco
                                    g)                     defect



             Apr       12            8            0           7         19         0        1         0

            May        28           17            5           3         17         2        1         0

             Jun       39           12            3           7         22         1        0         1