Page 272 - GM E-BOOKLET 2022
P. 272

PERFORMANCE STATISTICS




                                                                    2020-21          2021-22          2022-23
             S. No                 Description
                                                                  (Upto Oct)  (Upto Oct)  (Upto Oct)

               1            Average loco holding                     244.71           265.57           257.57

               2          Average Goods Outage                       111.34           126.83           128.28
               3                 Passenger Link                      101.61           110.14            107.2

                       Punctuality incidences (Loco)
               4                                                       3.3              7.9              17.9
                                    /100 locos
               5                  Asset failures                      16.3             58.7              75.5
                        Un-Usual Occurrences (UOR)

                                  per 100 locos                       87.0             113.0            114.8

                             Statistical ineffective
               6                                                      10.21            8.33              6.84
                                  (percentage)
                              Hourly ineffective %                    13.0             10.76             8.58

               7        Un-schedule visits/100 locos                  95.6             121.6             84.6

                          Un-schedule lifting's/ 100
               8                       locos.                         31.9             80.6              36.1
                        (Including minor schedules)

               9            Major Inspection done

              (a)          Term Overhauling (TOH)                       36               29               34
                         Intermediate Overhauling
              (b)                                                       7                25               22
                                       (IOH)

                                        Total                           43               54               56


              (c)     Periodical Overhauling (POH)/                   10/0              4/0              3/0
                       Mid Term Rehabilitation (MTR)