Page 340 - GM E-BOOKLET 2022
P. 340
from WL
direction and
passed Bypass
cabin at 09.20
hrs and
section (KMTP
station)
cleared at
09.27 hrs
2. Yard accidents and other train incidents: 04 Nos
Cause, Casualties,
Sl Brief description of Responsib
No accident & Cause Cost of damages & ility Status/Penalty
Committee imposed
On 05.05.2020 at Cause: Primary:
12.15 hrs, during During forward Sri. Md Reduction of pay
shunting of 8 BCN movement from M3 Umar, by one stage for a
wagons from M3 line towards SC end shunting period of 06 months
to M2 line at KZJ Pt No. 24 not set in Master (NC)
marshalling yard favour of the /KZJ &
Pt No.24 was not movement resulted Reduction of pay
set properly, trail through the by one stage for a
during forward point and while period of 06 months
movement Pt backing on the Sri. (NC)
1
No.24 trail through same point 6th B.Shanker, Withholding of
and while backing wagon taken two PM/KZJ
on the same point route and 5th wagon Annual increment
6th wagon from from engine front for one year
loco taken two trolley got derailed. Secondar without cumulative
routes and 5th Casualties: Nil y: effect.
wagon front trolley Cost of damages: Sri B
derailed on point. Nil Srinivasa
Committee: Rao,Sr
TI/KZJ, SSE/Pway/ shunter
CR/KZJ,CLI/KZJ, /KZJ
SSE/S&T/RRI/KZJ &
SSE/C&W/KZJ.
On 26.06.2020 at Cause: Newly laid Primary: Withholding of one
about 18.45 hrs, track defect P. set of PTO & One
while pushing Casualties: Nil Chandra set of Privilege pass
back the Cost of damages: Mouli, for the one year
formation of Nil Hammer
2
BOBYN rake from Committee: Man
PDPL end 3rd line AXEN/CON/PDPL, under the
(under TI/KZJ,SSE/C7W/KZJ,C control of
construction by LI/RDM. XEN/C/RD
RVNL) to Up loop M
338