Page 341 - GM E-BOOKLET 2022
P. 341
line of KOLR
station, 4th wagon
SCR 70090360186
trailing trolley two
wheels on left side
are in floating
condition and 5th
wagon SCR
70090260226
leading trolley all
wheels derailed
on right side due
to track defect.
On 23.09.20 at Excess blast heaps at Primary: Reduction of pay
about 15.45 hrs, rail level which may Smt. M. by one stage for a
BOXN Empty rake be the cause of Puspalath period of 01
with loco derailment. a/Gang year(NC)
No.16579, while Casualties: Nil mate
performing Cost of damages:
shunting Nil Blamewor Censure
movement by thy: Sri
pushing from Committee: TI/BPA, Subhamo
shunting neck to SSE/C&W/RDM, SSE/P y Tarafder
M-14 line in RDM Way/PDPL, CLI/RDM /PWI/RDM
marshalling yard,
3
leading wheel set
of leading trolley
of loco (L6-R6
wheel set)
derailed on curve
location in
shunting neck due
to the excess blast
heaps at rail level
which may be the
cause of
derailment.
On 25.10.2020 at Out of 3 shunting Primary:
about 17.37 hrs, staff, Sri Md Rafi was K Madhu, R/P by one stage
while pushing the in loco, Sri A Suman SHM/KZJ. for period of 01
LHB coaching was in the middle of year(NC)
empty rake the formation and Sri
4 consisting of 22 K Madhu, SHM was in
coaches for rear of the formation
stabling at and continuously
washing line-1 & 2 instructing shunter
in two portions, and loco points man
rear coach No. SC to back the
339