line     of     KOLR
                   station, 4th wagon
                   SCR  70090360186
                   trailing  trolley  two
                   wheels on left side
                   are     in   floating
                   condition  and  5th
                   wagon             SCR
                   70090260226
                   leading  trolley  all
                   wheels       derailed
                   on  right  side  due
                   to track defect.
                   On     23.09.20     at  Excess blast heaps at  Primary:           Reduction of pay
                   about  15.45  hrs,  rail  level  which  may  Smt. M.              by one stage for a
                   BOXN  Empty  rake  be  the  cause  of  Puspalath                  period of 01
                   with             loco  derailment.                 a/Gang         year(NC)
                   No.16579,       while  Casualties:  Nil            mate
                   performing              Cost  of  damages:
                   shunting                Nil                        Blamewor       Censure
                   movement           by                              thy:    Sri
                   pushing          from  Committee:  TI/BPA,  Subhamo
                   shunting  neck  to  SSE/C&W/RDM, SSE/P  y Tarafder
                   M-14  line  in  RDM  Way/PDPL, CLI/RDM             /PWI/RDM
                   marshalling  yard,
              3
                   leading  wheel  set
                   of  leading  trolley
                   of    loco     (L6-R6
                   wheel             set)
                   derailed  on  curve
                   location            in
                   shunting neck due
                   to the excess blast
                   heaps  at  rail  level
                   which may be the
                   cause               of
                   derailment.
                   On  25.10.2020  at  Out  of  3  shunting  Primary:
                   about  17.37  hrs,  staff,  Sri Md  Rafi was   K Madhu,  R/P by one stage
                   while  pushing  the  in  loco,  Sri  A  Suman  SHM/KZJ.           for period of 01
                   LHB        coaching  was in the middle of                         year(NC)
                   empty            rake  the formation and Sri
              4    consisting  of  22  K Madhu, SHM was in
                   coaches            for  rear of the formation
                   stabling            at  and        continuously
                   washing line-1  &  2  instructing        shunter
                   in  two  portions,  and loco points man
                   rear coach No. SC  to            back        the