Page 130 - GM's Annual Inspection Booklet DEC- 2022
P. 130
i. Energization of newly Erected OHE between MBNR – GED:
single BG line OHE between section MBNR and GWD (RKM – 72.70,
TKM – 82.53) energized and authorization given by PCEE for running electric traction
locomotive after inspection on 27.11.2022.
C .Energization of Manoharabad (MOB/TSS) with incoming supply on 28.10.2022
Manoharabad MOB/TSS of 132/25KV charged successfully on 28.10.2022 by extending
132KV supply From Narsapur TSTRANSCO sub-station (GSS).
D .Panduranga swamy Road (PASR/TSS): Charged on 29.10.2022
Divitipalli TSS of 132/25 KV charged successfully on 29.11.2022 by extending 132KV
supply From Ankannapally TSTRANSCO sub-station(GSS).
V. Reliability improvement works:
i. Provision of Disconnector assembly on top side of the Lightning Arrester (LA):
As per revised SMI no. TI/SMI/0048 (Rev. 1) dated: 23.07.2021, the Disconnector assembly of LA
should be repositionedat the Top of the LA. The Division has taken-up the work and replaced
16no LAs modifications.
ii. Checking of OHE with 2032mm Pantograph:
As per the instructions from the Headquarters, the Checking of OHE with 2032
pantograph completed in KCG - MOB , KCG - UR section in HYB Division.
128