P. 129

2. TRACTION  SUB-STATIONS  POSITION:


                S.No.      Name of TSS            Commisioned on                  Feeding Zone

                   1.         DTP TSS                 23.07.2022                    HPG/SP to
                                                                                     GWD/SP

                   2.        MOB TSS                  28.10.2022                 SFX/SP to KMC

                   3.        PASR TSS                 29.10.2022                GWD/SP to RC/SP
            *. SNF/TSS of SC Division feeding from SFX/SP to HPG/SP.
            *. MRTD/TSS of SC Division feeding from NZB to BDHN.
            *. RGM/TSS of GTL Division feeding From DHNE/SP to KRNT.

            III.  Good Works done by TRD/HYB during the year 2022-23( Till Nov 30-2022) :

                      1.   Replacement of existing O portal with R portal at KCG yard due to
                           klaying of track  for IOH SHED at loc.7/25-26.
                                                                                               st
                      2.   Cross feeder elimination work done at SFX/SP to eliminate the 1   cross feeder.
                      3.   2 new masts with cantilever assembly erected at KCG yard and
                           extended 38M OHE on Engine siding to accumulate extra
                           locomotives.
                      4.   19No.  LA disconnectors provided at  MOB/TSS,  MED/SSP,  BMO/SSP, SFX/SP.
                      5.   Provided Nylon mesh on 40No. of Portals/TTC to reduce CB
                           tripping between UR and MOB.

            IV.  MILESTONE  OF TRD HYB DIVISION DURING 2022-23:

            A. Energization of newly constructed Traction sub-station
               Divitipalli(DTP/TSS): Charged on 23.07.2022

             Divitipalli TSS of 132/25KV charged successfully on 23.07.2022 by
               extending 132KV supply From Timmajipeta TSTRANSCO sub-stati

            B.  Energization of newly erected OHE:

            i.  Energization of newly Erected OHE between MOB – KMC :
                 Newly  Erected  OHE  on  single  BG  line  section  between  MANOHARABAD  –
                 KAMAREDDY  (RKM:  66.37KM,  TKM:  82.53KM)  Energized  and  approved  by
                 PCEE/SCR on 27.10.2022.























                                                           127