Page 131 - GM's Annual Inspection Booklet DEC- 2022
P. 131

VII Other  Safety  Improvement  Works  in  train  operations:


        1. Provision of Sigma Boards ahead of STOP Signals:To assist
           Loco pilots  for  easily  identifying  the STOP signals during
           foggy weather conditions, Division has taken up the work of
           provision of Retro reflective
           SIGMA boards, ahead of the STOP signals.  120 no‟s sigma
           boards were provided.


        2. Provision of new  earth pits:
           Total 15 no.s of new earth pits are provided in SC - FMsection for improving the earthing
           network in safety point of view.

        3. Provision  of  Thimbles:

           To avert the catenary strands cut inside the catenary suspension clamp at the time of
           tripping with high fault currents particularly in monkey menace areas, RDSO issued the
           provision thimblesin each location. Total in 418 locations thimblesare being provided.













        4. Provision of Nylon net on portals:

        As  per  TI/MI/0050 issued  by RDSO  to  prevent from Bird menace  on Traction Installations by
        provision of Nylon net inside the existing fabricated structures. 40 No. Portals/TTCs of nylon
        mesh provided.
















        5. Total 652 No‟s Tree branches trimmed due to less clearance from Live OHE.












                                                           129
   126   127   128   129   130   131   132   133   134   135   136