HYDERABAD DIVISION - GATI SHAKTI WORKS - 12/12/2022
                                                                PLAN HEAD - 1600 (Traffic Facilities)
         SN PH PROJECT  PH Y-o-S PB   Short Name of Work          Alloc.  Last Sanc  Exp.   Exp.   Exp.   Anti.   Est.   %age  REMARKS           Status
            SN ID            Item                                      Cost   upto   during   upto   TDC of   Status  Phy.
                             (PB,LB                                                                      prog
                             ,DRM)                                            March  2022-  date  Rly    of Rly
                                                                              '22  2023       portion
         1  1 11.03.16. 16 2018-LB-  Nizamabad- Remodelling of yard arrangements Cap.  87984  5316 388  5704  31/03/ RE   10 Work kept under abeyance will be taken up after   WIP
              18.3.52.0  2019 10  for providing additional platforms and one full             2023  under   shifting of Goods Shed to JKM.
              01                 length dead end spur.                                             prep.    Will be Proposed from IRPSM. TDC 31/03/2023

         2  2 11.03.16. 16 2021-LB-8 Janakampet Jn:  Provision of  two Additional   Cap.  107607 0  0  0  31/03/ Det.   0  LOA Issued for Relay Room, TWO Addl Loop Lines on  WIP
              21.1.52.0  2022    loop lines to cater the operational needs.                   2023  Est.    29/07/2022 and
              01                                                                                   Sanc.    LOA Issued for Addl. Loop Line to Cater the
                                                                                                            Operations on 05/08/2022.
                                                                                                            Tender Opened on 05/07/2022 for Br.No. 466.
                                                                                                            Detailed Estimate Sanctioned. Tender to be
                                                                                                            Finalized. TDC 31/03/2023.
         3  3 11.03.16. 16 2021-LB-  Falaknuma - Provision of DN loop line   Cap.  92063  0  48  48  31/03/ Det.   0  PF earth Work is in progress. Work Stopped due to   WIP
              21.1.52.0  2022 15  (Standard Double line layout.                               2023  Est.    Cable Diversion, Since 10/10/2022. TDC 31/03/2023