Page 399 - GM's Annual Inspection Booklet DEC- 2022
P. 399
SN PH PROJECT PH Y-o-S PB Short Name of Work Alloc. Last Sanc Exp. Exp. Exp. Anti. Est. %age REMARKS Status
SN ID Item Cost upto during upto TDC of Status Phy.
(PB,LB prog
,DRM) March 2022- date Rly of Rly
'22 2023 portion
12 9 11.03.30. 30 2019-LB- SC-MUE Section :- Proposed construction of RRSK 0 0 0 0 31/03/ DE 0 Joint inspection completed. Alignment and GAD are WIP
19.1.52.0 2020 162 Road over Bridge as 1x46.00M clear span 2024 under under finalization. Form-A was submitted by the
03 composite steel girder at Km 607/0-100 in lieu prep. state Govt. and Form- B was submitted to State
of LC No.228 Govt. by Railways.
13 10 11.03.30. 30 2019-LB- Jankampet-Bodhan - Road over bridge in lieu RRSK 0 0 0 0 31/03/ DE 0 A joint inspection was conducted on 27.08.2020. WIP
19.1.52.0 2020 187 of manned level crossing No.12/JB 2024 under Alignment plan received from State Govt. on
04 prep. 17.07.2021. GAD has been prepared with a span of
1x72 bow string steel girder(4 lane) and processed
for review of Hyderabad division on 21.07.2022.
State Govt is requesting 4 lanes (2 lanes on Cost-
sharing and 2 lanes with deposit terms) There is no
administrative sanction of Telangana State Govt. for
construction of this ROB.
14 11 11.03.30. 30 2019-LB- SC-MUE Section :-Construction of Road over RRSK 0 0 0 0 31/03/ DE Alignment finalized in Jan'21, Form-A received. GAD WIP
a
r
p
f
o
,
n
a
t
i
e
e
u
n
u
n
d
p
r
d
e
r
i
l
R
.
y
e
n
.
i
t
n
o
p
r
o
o
u
s
v
r
l
e
d
s
a
d
y
e
w
2
g
e
d
B
r
i
a
7
2
.
x
s
1
4
1
.
5
.
19.1.52.0 0 2020 164 Bridge as 1x72.00M clear span Bow string 2023 3 under r under preparation, field survey was done. Rly. portion
1
9
2
0
1
6
2
.
2
0
0
w
s
B
o
t
g
2
0
r
i
n
a
e
r
l
M
0
c
s
n
a
p
05 steel girder at Km 1/700-800 in lieu of LC prep. GAD under preparation. Now work has transferred to
NO.2/MLY Gati shakthi.
15 12 11.03.30. 30 2019-LB- HYB Divmn :- Bolarum-Cavalry Barracks - Road RRSK 0 0 0 0 31/03/ DE 0 Alternate alignment is under consideration. WIP
19.1.52.0 2020 182 over bridge in lieu of manned level crossing 2024 under Alignment-1&2: A lot of land acquisition is involved.
06 No.250 prep. Alignment- 3: RUB can be proposed near to existing
natural drainage available. Sufficient embankment
height and a direct road approach are available.
Feasibility is under study. Span configuration to be
decided. If RUB is not feasible, GHMC is requested to
send a letter to Railways for dropping the work.
16 13 11.03.30. 30 2019-LB- HYB Div :- UPW-KMC- Road over bridge in lieu RRSK 0 0 0 0 31/03/ DE 0 Joint Inspection to be done. Alignment is in process WIP
19.1.52.0 2020 186 of manned level crossing No.209/A 2024 under of finalization.
07 prep.